Monday, April 1, 2019
Hanga Poti
Inaz is tying the bamboo together with the pipes
Kei te here a Inaz i nga bamboo me nga pou whakarāmemene.
The group are gathering the tyre tube together and planning the layout of the raft
Kei te whakakao te roopu i nga wira rapa me whakaputa whakaaro mo te ahua o te waka.
Lucas and Colin is tying the tyre tube together with rubber strips
Kei te here a Lucas raua ko Colin i nga wira ma te taura rapa.
Pachynce is tying the tyre and the bamboo together.
Kei te here a Pachynce i te rakau me nga wira whakaramemere.
Chelsea and Inaz is tying the plastic thing with the tyre tube.
Kei te here a Inaz raua ko Chelsea i te parahitiki ki nga wira.
Inaz checking if the plastic thing is tight.
Kei te titiro a Inaz mena kei te piri te parahitiki ki nga wira.
Inaz and Chelsea is making sure if everything was alright
Kei te titiro a Inaz raua ko Chelsea mena kei te piri nga mea i runga i te waka.
Pachynce and Lucas is unpacking everything from the trailler
Kei te tangohia a Pachynce raua ko Lucas i te waka mai te motuka.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment